The weekend's weather was nice enough to do some work outside so I thought I'd give this 65 Mustang some fresh air. I managed to accomplish some work too. The old door mechanicals were removed and will be residing in their new doors soon. The doors I had are just too far gone to warrant repairs. The interior side on one door is rusted out and slathered with Bondo (not a good look) and the other door also rusted out and is bent where the hinge mounts are -- looks like its Ivy Green donor was in an accident. Incidentally, mine was originally Silver Blue
The picture shows what the ride height will be like at the front end. Pretty low already and the engine is not even installed yet. The coilovers are pretty stiff. Also, with the 96 Mustang 17" Cobra wheels mounted, theres not a whole lot of clearance but there is no contact without rolling the fenders. The tires are 245 45 17 in case you're wondering.
Kinda looks like crazy old-school rake is going on (not my taste) but its just that the rear has new springs and it sits really high with only the 100 pounds weight on it.
The engine and T-5 transmission go in next.
The illustrated story of Restoration, Modernization, and Modification of my 1965 Fastback Mustang.
Wednesday, April 13, 2011
Sunday, March 27, 2011
On 4 wheels
Tuesday, March 8, 2011
Front Suspension - Completed
I started the installation with the lower control arms and coil-over shocks. This was extremely easy. Its just a matter of bolting the parts in place. No adjustments needed. Next came the upper control arms. This was also simple but required some thick washers to be added for setting the initial camber.
This step was followed by installing the pre-assembled spindles. When I ordered the front end kit from the dealer, Ryan at Stang-Aholics, I opted for the basic disc and caliper and it comes ready to install with bearings packed and calipers and pads already in place.
After that, I installed the power steering rack. The rack needs to be steered to the center point on the range so that the steering wheel will be centered. At this point I set the toe-in to roughly 1/8" at the rotors and spun the tie-rod ends on to equal turns and attached them to the spindles.
Lastly, I installed the sway bar. I decided to leave it a steel finish and clear coat it.
Finally, the suspension install is complete and ready for the engine and wheels. Just in time since I need to push the car out of the garage to do some electrical work on the house.
Next, after painting the firewall and the rest of the floor underneath, I will be installing the RJM Injection EFI harness and the ECU.
Sunday, February 27, 2011
Sway bar mount
The old strut rod mount and sway bar bracket had to be removed and the new sway bar mount installed in its place. This requires drilling out 13 or 14 spot welds on each mount/bracket and separating the parts from the frame. Sounds easy but if you dont cut all of the welds or miss a little bit, the task is a real knuckle buster. I did eventually get the old parts off but not without cutting the parts a little to make the job easier.
The new Total Cost Involved sway bar brackets were pretty easy to install. I just cleaned up the area with the grinder, clamped it in place and welded. Welding was easier since I only had to attach the 3/16" thick bracket to thick sheet metal frame rail.
While the primer was drying, I finished installing the rear end. Always nice to see some more parts installed. Its starting to look like a car and will be on four wheels soon.
Sunday, February 13, 2011
Front Suspension 7
Wednesday, February 9, 2011
Front Suspension 6
Once everything was plumb and square, I completely welded around the cross member's contact points. After a finish grinding I was ready to install the A-arm/shock towers.
The A-arm/shock tower is bolted in place using the alignment hole and clamped against the frame rail for tack welding. After clamping, I noticed that the tower was not square to the frame rail and cross member so I had to add a thin shim between the frame rail and the tower. Once lined up right, I tacked it in place and removed the clamps.
The final welds were done with my Millermatic 140 MIG welder cranked up to 100 and wire speed at 67. I could have definitely used a little more power but I was able to accomplish it with more than one pass in some places.
The front end welding is finally complete! If I was impatient I would start bolting parts on now but I think I'll resist the temptation.
Any suggestions?
Monday, January 31, 2011
Front Suspension 5
With the .030 MIG wire replenished and a fresh Argon/CO2 fill up, I completed the frame rail boxing and was ready to install the new cross member. This is where the more "funner" installation of new parts begins.
The critical alignment points are at the locating plates and the crossmember faces must be square to the frame rails.
The Total Cost Involved 1965 Mustang coilover suspension comes with a new heavy-duty cross member frame piece with the motor mount ears, lower control arm mounts, and power steering rack mounts in place. Installation is just a matter of slipping the cross member in from underneath, up against the locating plates and carefully welding around the contact points.
In reality though, it didn't go as smooth as that. The instructions say that the ends of the crossmember may need to be trimmed to fit. My reinforced frame rail spacing is 27 1/4" and the crossmember is 27 3/8th " so I had to trim about 1/6th inch off each end. This was easy to do once marked up and attacked with a grinder.
Once the grinding was done, the dimensions were equal so it took a little pounding to get it in place and ready to weld.
Sunday, December 5, 2010
Front Suspension 4
To complete the reinforcement frame rail boxing, the bottom plates are added. They are curved to fit the profile of the existing frame rail and are aligned using the bolt hole from the original cross member bar. For the plate to lay in flat and straight, the old cross member's built-in threaded nut had to be cut and ground flush with the surface since it was protruding above the surface.
Once the smoothing was done, I clamped the plate in making sure it was parallel and square with the other reinforcement plate. I tack welded and began to complete the perimeter welds with the MIG... crap! Out of MIG wire for now.